ICC Commercial Building Inspector Practice Test

Disable ads (and more) with a membership for a one time $2.99 payment

Prepare for the ICC Commercial Building Inspector Test with our quiz. Review with flashcards and multiple-choice questions, each offering hints and explanations. Get exam-ready!

Practice this question and more.


When a building inspector discovers that 2 No. 5 bars are installed instead of the approved 2 No. 4 bars in a footing, what is the proper action?

  1. Proceed without any changes

  2. Ignore the discrepancy

  3. Resubmit the plans for approval as an amended set

  4. Consult the project manager

The correct answer is: Resubmit the plans for approval as an amended set

The correct course of action in this situation is to resubmit the plans for approval as an amended set. Building codes and approved plans are designed to ensure structural integrity and safety. When there is a discrepancy between what has been installed and what was approved, it is crucial to address this formally. In this case, the installation of No. 5 bars instead of No. 4 bars constitutes a significant deviation from the approved structural design. Even though No. 5 bars may provide greater strength, the specific design and structural calculations can be based on the dimensions and characteristics of the No. 4 bars. Changing rebar sizes can affect load-bearing capacity, stress distribution, and other critical structural elements. By resubmitting the plans, the inspector ensures that the change is reviewed and approved by the appropriate authorities, maintaining adherence to safety regulations and best practices. This process allows for any necessary adjustments to be made in the structural design to accommodate the installed reinforcement or to revert to the original specifications if the change is deemed unsuitable. This ensures that the overall integrity and compliance of the building project are upheld. The other options would not sufficiently address the situation. Proceeding without any changes or ignoring the discrepancy could lead to potential safety risks, while simply consulting the project